Idea: Landfill Mining

Howย to get into the market?

  • This article[1] mentions the need for software to simulate what a landfill may contain.
  • Build that software
    • How to measure/estimate the potential profitability of a landfill:
      • Triangulation?
        1. Drill 3 deep holes around the perimeter of the landfill
        2. Install sensors to detect specific materials
        3. Triangulate the position of certain materials/objects
      • Ground Penetrating Radar[2] (GPRS)
      • Cityโ€™s/Landfillโ€™s historical records

Potential opportunities:

  • A town called Emelle[3], in Sumter County, AL has the largest toxic waste dump in the nation[4].
  • Moldova has one of the worst waste problems in the world.
  • Tuscaloosa Landfills[5]

Update 10/23/21

Itโ€™s really cool to see companies like Stronghold Digital Mining[6] that are now building solutions to related land remediation problems.

Footnotes

  1. www.fastcompany.com Back to reference 1
  2. en.wikipedia.org Back to reference 2
  3. en.wikipedia.org Back to reference 3
  4. www.umich.edu Back to reference 4
  5. www.tuscaloosa.com Back to reference 5
  6. strongholddigitalmining.com Back to reference 6

Comments

Leave a Reply

Your email address will not be published. Required fields are marked *